853 A.2d 497
No. (SC 17131).Supreme Court of Connecticut.
Borden, Norcott, Palmer, Vertefeuille and Zarella, Js.
Syllabus
The plaintiffs, A Co., the contract purchaser of a forty-two acre parcel of real property located in the city of Milford on which it proposed to construct a residential housing development, and M, the owner of the property, appealed from the judgment of the trial court denying their writ of mandamus to compel the defendants, the city, the sewer commission and its chairman, to approve A Co.’s application to connect the
Page 410
property to the city sewer system. In 1981, the commission, as the water pollution control authority for the city, had proposed a plan to extend the sewer system so that eventually it would encompass the entire city. Although a 1998 construction contract would have extended the sewer system to a public road approximately 200 feet from A Co.’s property, the commission terminated the contract for fiscal, health and safety reasons, after attempts to remove bedrock by blasting had threatened to damage certain water and gas mains. Thereafter, the commission decided to complete the construction of that portion of the sewer system pursuant to a proposed 2000 construction contract. During 2000, A Co. filed two sewer permit applications with the commission requesting approval to connect its proposed development to the city sewer system. The commission denied the first application because no sewer line was then available, and denied the second application because plans for the 2000 construction contract had not been finalized. Thereafter, the plaintiffs brought a mandamus action seeking an order directing the commission to permit the connection of A Co.’s proposed development to the city sewer system. Subsequently, in 2001, A Co. filed a third sewer permit application with the commission in which A Co. proposed to connect to the city sewer system by paying for the completion of the extension of the sewer line in the public road that the city had begun and halted under the 1998 construction contract. The commission tabled the application on the ground that the proposed plans for the 2000 construction contract still had not been finalized. The plaintiffs there-after amended their complaint seeking a writ of mandamus ordering the commission to approve the connection of A Co.’s proposed development to the city sewer system in accordance with its third sewer permit application. The trial court rendered judgment for the defendants denying the application for a writ of mandamus, from which the plaintiffs appealed. Held:
1. Because A Co.’s application, its complaint in the mandamus action and the amended prayer for relief revealed that A Co. was seeking to construct an extension of the public sewer system, and not merely attempting to connect to the existing system, the commission, in tabling A Co.’s third sewer permit application, properly classified it as one to construct an extension of, rather than a connection to, the city sewer system; in its application, A Co. had offered to pay for completing the extension of the sewer line that the city had started, in its complaint, A Co. asserted that the commission had no authority to prohibit it from extending, at its own cost, the sewer line within the public right-of-way for a sewer connection with its proposed development, and in its amended prayer for relief, A Co. provided three detailed options for connecting its proposed development to the sewer system at its own expense, which explicitly demonstrated that it was seeking to construct an extension of the sewer system.
Page 411
2. The trial court properly determined that the commission’s decision to table A Co.’s third sewer permit application until completion of the plans under the 2000 construction contract was a proper exercise of the commission’s discretion, and, therefore, a writ of mandamus to compel the performance of a discretionary duty would not lie; the commission correctly determined that because A Co.’s application was for an extension of the sewer system, and not a mere connection to the existing system, the application did not comply with the applicable regulations issued by the commission or the relevant provisions of the city code governing applications for connections to the city sewer system.
3. This court, having concluded that the commission had discretion to act on A Co.’s application seeking to extend the city sewer system, would not review A Co.’s claim that the findings made by the trial court concerning the legitimacy of the reasons behind the commission’s exercise of its discretion were clearly erroneous; A Co. did not claim to the trial court that a writ of mandamus was appropriate because the commission had exercised its discretion in an illegal, fraudulent or arbitrary manner, and, therefore, that court should have denied the writ of mandamus once it found that the commission had discretion to table the application for construction of an extension of the public sewer system.
4. A Co. could not prevail on its claim that the commission’s decision to table A Co.’s third sewer permit application conflicted with this state’s public policy supporting the development of affordable housing; a review of the affordable housing statutes revealed that the legislature has not required water pollution control authorities, such as the commission, to treat applications related to developments with affordable housing components differently from applications for other types of developments, as it has with other municipal bodies.
Argued April 21.
Officially released July 27, 2004.
Procedural History
Application for a writ of mandamus to compel the named defendant to approve the connection of the named plaintiffs proposed housing complex to the city of Milford’s sewer system, and for other relief, brought to the Superior Court in the judicial district of Ansonia-Milford, where the plaintiffs filed an amended complaint; thereafter, the matter was tried to the court Curran, J.; judgment for the defendants denying the application, from which the plaintiffs filed a joint appeal Affirmed.
Page 412
Joseph P. Williams, with whom were Timothy S. Hollister, Beth B. Critton, Brian Lema and, on the brief Stephen W. Studer, for the appellants (plaintiffs).
Michael J. Dorney, with whom were Matthew A. Sokol, Marilyn J. Lipton, city attorney, and, on the brief Charles R. Andres, for the appellees (defendants).
Opinion
NORCOTT, J.
This appeal arises out of an action brought by the named plaintiff, AvalonBay Communities, Inc. (AvalonBay),[1]
against the defendants, the sewer commission of the city of Milford and its chairman, Peter Vita (collectively, the commission), and the city of Milford (city), seeking a writ of mandamus ordering the commission to approve its application to connect a proposed housing development to the city’s sanitary sewer system. After a bench trial, the trial court denied the writ requested. AvalonBay appealed from the judgment of the trial court to the Appellate Court, and we transferred the appeal to this court pursuant to General Statutes § 51-199
(c) and Practice Book § 65-1.
On appeal, AvalonBay claims that the trial court improperly denied its request for a writ of mandamus because: (1) its application complied with all of the applicable regulations of the commission, and, therefore, it had a legal right to performance; (2) the commission had no discretion to depart from the ministerial task of approving the application; and (3) it had no adequate remedy at law. Additionally, AvalonBay claims that the trial court’s factual findings were clearly erroneous, and that the judgment of the trial court thwarts this state’s public policy in favor of the development of affordable housing. In response, the commission claims
Page 413
that: (1) the trial court properly found that the commission had discretion to deny AvalonBay’s application; (2) the trial court properly exercised its discretion in denying the relief requested; and (3) the trial court’s evidentiary findings were not clearly erroneous. We agree with the commission. Accordingly, we affirm the judgment of the trial court.
The following facts, as set forth by the trial court in its memorandum of decision, are relevant to this appeal. “The property, which is subject of the mandamus, is owned by the [e]state of Patricia McGannon and is presently under contract of sale to AvalonBay . . . the proposed developer of the property. . . . The property consists of some forty-two acres . . . and is located in the northwestern section of the city . . . in the immediate vicinity of and south of the Wilbur Cross Parkway. More specifically, the property is located southwest of the intersection of Wheeler’s Farm Road and Wolf Harbor Road. The property is presently unimproved. AvalonBay proposes to erect thereon [a development containing] some 284 units of luxury housing,”[2] a percentage of which would be set aside as “moderate income housing” under General Statutes § 8-30g (3).
The commission “was created by [29 Spec. Acts 142, No. 139 (1959)] of the 1959 General Assembly. . . . In its present form, the provisions establishing and maintaining the commission may be found in article IV, [§§ 2 and 9] of the Milford charter. As the water pollution control authority, the commission holds the powers vested in such an authority by way of chapter 103 of the . . . General Statutes.[3]
“Pursuant to the authority contained therein, a facility plan and environmental assessment dated January,
Page 414
1981, [was] filed with the state of Connecticut. Included with the plan was a 1979 map of the proposed sewer system and extensions . . . [which demonstrated] that the city and [the] commission contemplated the eventual expansion of the sanitary sewer system so as to encompass the entire city. Since that time, the area of coverage has been steadily extended by a series of contracts designated by year and number. . . .
“Contract No. 1998-1 called for the extension of the sewer system to serve an area south of the Wilbur Cross Parkway, including Wolf Harbor Road and several other streets in the area. . . . [Specifically] contract No. 1998-1 was designed as an extension of the [city] sanitary sewer system to run from West River Street westerly along Wolf Harbor Road to a point approximately 200 feet easterly of [AvalonBay’s] property.”[4]
“On February 26, 2000, a contract was let to perform the work specified in [contract No.] 1998-1. During the course of that work, serious difficulties were encountered. Located in Wolf Harbor Road [were] a natural gas main and a sixteen inch water main. As the construction proceeded, the contractor encountered bedrock. . . . Attempts to remove the bedrock by blasting caused several breaks [in the water main], disrupting the water flow in the area. On May 4, 2000, the blasting disrupted the water main for the third time, causing the regional water authority to demand a halt to the project. The commission ordered a halt to the project, although it allowed an extension of the sewer main to station 12-40. . . . The bedrock was removed by mechanical means [in that limited area]. The contractor offered to continue the project removing the bedrock by mechanical means. This would . . . [have] entail[ed] an additional
Page 415
cost for which funds would have to be appropriated. . . .[5]
“In an effort to find a solution to the problem, the commission, on July 6, 2000, voted to halt the construction in Wolf Harbor Road under contract No. 1998-1 and to include that section of Wolf Harbor [Road] under the design contract No. 2000-1 . . . [which the commission] had entered into . . . with its consultants for the design and extension of the sanitary sewer system covering an area north of Wilbur Cross Parkway. . . . The area covered by [contract No.] 2000-1 is to be connected to the area covered by [contract No.] 1998-1. . . . An amendment to contract [No.] 2000-1 was entered into to consider the Boy’s Village tie-in and the redesign of the sewers in Wolf Harbor Road west of station 12-40, the termination point for contract [No.] 1998-1.”
During 2000, AvalonBay had “applied to various land use boards in the city . . . seeking various approvals for its proposed development of a luxury apartment community with an affordable housing component, pursuant to . . . § 8-30g.” More specifically, in “July, 2000, AvalonBay [had] filed an application for sewer approval. The commission, in August, 2000, denied the application without prejudice, giving as its reason that no sewer line was then available. The following November, [AvalonBay] filed a second application asking for permission to connect their development to the sewerage system. The commission, on December 17, 2000, denied the application without prejudice, giving as [its] reason for [denial] that a design study was under way
Page 416
for the Wheeler’s Farm Road and Wolf Harbor Road area, and the study was then only 10 percent complete.”
“A mandamus action was brought by . . . AvalonBay on April 27, 2001, seeking an order directing the [commission] to permit the connection of [its proposed] development to the city . . . sewer system.[6] [Subsequently, a] third application was filed with the [commission] on July 19, 2001. The matter was tabled awaiting finalized plans for the preliminary design [under contract No. 2000-1] of that segment of the [sewer system] that would service the area, including [AvalonBay’s] property.”[7] AvalonBay’s third application is still pending before the commission. Consequently, because work under contract No. 1998-1 was halted, and the plans being developed under contract No. 2000-1 were still in the preliminary stages of design, there was no sewer system in the road closest to AvalonBay’s property, namely, Wolf Harbor Road, at the time of trial. In a written memorandum of decision, the trial court denied AvalonBay’s request for a writ of mandamus. This appeal followed.
The requirements for the issuance of a writ of mandamus are well settled. “Mandamus is an extraordinary remedy, available in limited circumstances for limited
Page 417
purposes. . . . It is fundamental that the issuance of the writ rests in the discretion of the court, not an arbitrary discretion exercised as a result of caprice but a sound discretion exercised in accordance with recognized principles of law. . . . That discretion will be exercised in favor of issuing the writ only where the plaintiff has a clear legal right to have done that which he seeks. . . . The writ is proper only when (1) the law imposes on the party against whom the writ would run a duty the performance of which is mandatory and not discretionary; (2) the party applying for the writ has a clear legal right to have the duty performed; and (3) there is no other specific adequate remedy.” (Internal quotation marks omitted.) Miles v Foley, 253 Conn. 381, 391, 752 A.2d 503 (2000). “Even satisfaction of this demanding [three-pronged] test does not, however, automatically compel issuance of the requested writ of mandamus. . . . In deciding the propriety of a writ of mandamus, the trial court exercises discretion rooted in the principles of equity.” (Citation omitted.) Hennessey v Bridgeport, 213 Conn. 656, 659, 569 A.2d 1122 (1990). We review the trial court’s decision, therefore, to determine whether it abused its discretion in denying the writ.
“In an equitable proceeding, the trial court may examine all relevant factors to ensure that complete justice is done. . . . The determination of what equity requires in a particular case, the balancing of the equities, is a matter for the discretion of the trial court.” (Internal quotation marks omitted.)Northeast Savings, F.A. v. Hintlian, 241 Conn. 269, 275, 696 A.2d 315 (1997). “In determining whether the trial court abused its discretion, this court must make every reasonable presumption in favor of its action.” (Internal quotation marks omitted.) Yanow v. Teal Industries, Inc., 196 Conn. 579, 583, 494 A.2d 573 (1985).
Page 418
I
As an initial matter, we must clarify the nature of AvalonBay’s third application to the commission. In its amended prayer for relief, AvalonBay had sought a writ of mandamus “ordering the [commission] to approve the connection of the proposed . . . development . . . in accordance with [its] July 19, 2001 application. . . .”[8] (Emphasis added.) On appeal, however, AvalonBay characterizes its third application alternatively as one for “the connection of its proposed development to the . . . sanitary sewer system,” and as one for “th extension of [the city’s] public sewer system to serve AvalonBay’s proposed residential development.” (Emphasis added; internal quotation marks omitted.) The commission classifies AvalonBay’s application as one to construct an extension of the public sewer system, and not one for a mere connection to that system. We agree with the commission’s classification.
A review of AvalonBay’s application to the commission, as well as its complaint in the present mandamus action, makes clear that it was seeking to construct an extension of the public sewer system, and not attempting merely to connect to the existing system. As counsel for AvalonBay wrote in a letter to the commission in support of the July 19, 2001 application: “AvalonBay proposes to connect to the [c]ity sewer system by paying for completion of the extension of the sewer line in Wolf Harbor Road which the [c]ity has already begun,” and halted, under contract No. 1998-1. (Emphasis added.) Subsequently, AvalonBay filed its complaint in the present action, asserting that “[n]o rule, regulation, policy or custom of the . . . [c]ommission empowers it to prohibit a property owner, at its
Page 419
own cost, from extending a sewer line within a public right-of-way for a sewer connection that is otherwise in full compliance with [c]ommission requirements.” (Emphasis added.) Both of these documents demonstrate that AvalonBay was seeking to complete an extension of the public sewer system in the city.
Moreover, in response to an order of the trial court, AvalonBay filed an amended prayer for relief that provided a more detailed description of the proposed connection than it had provided in its amended complaint. See footnote 6 of this opinion. More specifically, in its amended prayer for relief, AvalonBay provided three detailed options for connecting the proposed development to the sewer system, all of which it offered to construct and pay for itself. Of these three options, the first two proposed to connect at the spot where the work under contract No. 1998-1 was terminated — down Wolf Harbor Road at station 12-40.[9] Essentially, under these two options AvalonBay was requesting permission to complete, at its own expense, the work that remained under contract No. 1998-1. The third option proposed to connect to a location on Wheeler’s Farm Road that had been identified as a possible sewer location in the preliminary design under contract No. 2000-1.[10] That third option also stated, however, that if the commission “has not commenced the installation of a
Page 420
sewer line in Wheeler’s Farm Road at the time that AvalonBay obtains a zoning permit for [the proposed development], the [commission shall approve the connection of the [development] to the sewer system via [the prior two options].” All three of these options explicitly demonstrate that AvalonBay was seeking to construct an extension of the sewer system. The fact that AvalonBay offered both to pay for and to complete the work envisioned by all three of these options does not transform its application into one for a mere connection. Under §23-37[11] of the Milford code, AvalonBay already was responsible for the complete cost of connecting its proposed development to the sewer system. Therefore, by offering to pay for all of the costs related to all three of its options, AvalonBay implicitly concedes that it was seeking more than a connection to the public sewer. Moreover, the fact that all three of the options were modeled on designs for a public sewer system, would run underneath a public street,[12] and would become part of the public sewer system upon completion lead inexorably to the conclusion that AvalonBay was seeking to construct an extension of the city sewer system. See BRT General Corp. v. Water Pollution Control Authority, 265 Conn. 114, 117 n. 6, 826 A.2d 1109 (2003) (noting that, although entitled application to “`connect'” to sewer system, trial court found “that the application was for an `extension’ of the sewer system”).
Page 421
II
The trial court determined that the commission’s decision to table AvalonBay’s third application until completion of the plans under contract No. 2000-1 was a proper exercise of its discretion. AvalonBay now claims that the trial court improperly failed to determine, as an initial matter, whether the commission had any discretion to exercise in connection with the application. More specifically, AvalonBay claims that because its application complied with all applicable regulations, the commission’s duty to approve the application was mandatory and not discretionary. The commission contends that, because AvalonBay’s application was for an extension of the sewer system, and not a mere connection to the existing system, the application did not comply with its regulations, and, therefore, it had discretion to table it until completion of the new plans. We agree with the commission.[13]
Page 422
It is axiomatic that “[t]he duty [that a writ of mandamus] compels must be a ministerial one; the writ will not lie to compel the performance of a duty which is discretionary “Beccia v. Waterbury, 185 Conn. 445, 453, 441 A.2d 131 (1981). “Consequently, a writ of mandamus will lie only to direct performance of a ministerial act which requires no exercise of a public officer’s judgment or discretion. . . . Furthermore, where a public officer acts within the scope of delegated authority and honestly exercises her judgment in performing her function, mandamus is not available to review the action or to compel a different course of action.” (Citation omitted; internal quotation marks omitted.) Clark v Gibbs, 184 Conn. 410, 419, 439 A.2d 1060 (1981). “Discretion is determined from the nature of the act or thing to be done rather than from the character of the office of the one against whom the writ is directed.” 52 Am. Jur. 2d 316-17, Mandamus § 49 (2000). Because we have concluded that AvalonBay’s application was for the construction of an extension of the public sewer system in the city, we must review the general nature of such an activity in order to ascertain whether the commission had discretion to table AvalonBay’s application.
Our Appellate Court addressed a similar question i Archambault v. Water Pollution Control Authority, 10 Conn. App. 440, 523 A.2d 931 (1987). In that case, although the surrounding roads were being provided with sewer service, the water pollution control authority of the town of Waterford had assigned a low priority to the plaintiffs’ road, and had not included it in the current round of sewer installations. Id., 441. The plaintiffs
Page 423
brought an action seeking a writ of mandamus “to compel the defendant to make provisions for the furnishing of sewer service” to their road. Id. The trial court found that § 16-9 of the Waterford code imposed a mandatory duty upon the defendant to install the sewer service extension to the plaintiffs’ road. Id., 443. The Appellate Court reversed the trial court, finding that because the installation of sewers was planned for the plaintiffs’ road in the future, “[t]he advancement of that time by the [trial] court was in error” because §§ 16-91 and 16-92 of the Waterford code retained the town’s discretionary authority over where and when to construct sewer extensions. Id., 445. In addition, the Appellate Court stated the following proposition: “It is well settled that a municipality has wide discretion in connection with the decision to supply sewerage. . . . Although this discretion is not absolute, [t]he date of construction, the nature, capacity, location, number and cost of sewers and drains are matters within the municipal discretion with which the courts will not interfere, unless there appears fraud, oppression or arbitrary action. Accordingly, mandamus or a mandatory injunction will not issue in such case.” (Citation omitted; internal quotation marks omitted.) Id., 444, quoting 11 E. McQuillin, Municipal Corporations (3d Ed. Rev. 1977) § 31.17.
Similarly, in Vicksburg v. Vicksburg Waterworks Co., 202 U.S. 453, 471-72, 26 S. Ct. 660, 50 L. Ed. 1102
(1906), the Circuit Court had ordered the municipality to extend its sewer system and construct a new outlet for discharging sewage into either the Yazoo River or the Mississippi River. The United States Supreme Court held that the Circuit Court “had no authority to issue a mandatory injunction requiring the city to construct a sewer, irrespective of the exercise of discretion vested by law in the municipal authorities to determine the practicability of the sewer ordered, the availability of taxation for the purpose, and the like matters; and we
Page 424
think that the exercise of this authority is primarily vested in the municipality and not in the courts.” Id., 472; see als Stephenson v. Common Council, 213 Mich. 668, 672, 181 N.W. 1001 (1921) (reversing order of writ of mandamus; finding that duty to construct public sewer “will not be controlled by mandamus” [internal quotation marks omitted]) Miller v. Brentwood, 548 S.W.2d 878, 883
(Tenn.App. 1977) (“there is no authority for compelling a city to construct an artificial drainage sewer; and it would be a radical, dangerous and undemocratic precedent for the [c]ourts to undertake to enter into municipal legislation and administration in any such respect”); State ex rel. Vanderwall v. Mayor and Common Council, 134 Wis. 437, 442, 114 N.W. 802 (1908) (“[t]he duty of providing for and constructing sewers by a municipality is a quasi judicial or legislative power involving judgment and discretion . . . [and such] duty will not be controlled by mandamus” [citations omitted]); 52 Am. Jur. 2d, supra, § 225 (“mandamus does not lie to control municipal discretion with respect to the construction or extension of sewer systems”). The conclusions reached in Vicksburg and Archambault are instructive to our resolution of the present case.[14]
Page 425
“It is settled law that as a creation of the state, a municipality has no inherent powers of its own. . . . A municipality has only those powers that have been expressly granted to it by the state or that are necessary for it to discharge its duties and to carry out its objects and purposes. . . . This principle applies with equal force to quasi-municipal corporations. . . . A sewer district established under chapter 105 of the General Statutes is a quasi-municipal corporation . . . which, through its sewer authority, has the power to acquire, construct, maintain, supervise, manage and operate a sewer system and perform any act pertinent to the collection, transportation and disposal of sewage. General Statutes 7-245. . . .” (Citations omitted; internal quotation marks omitted.)Wright v. Woodridge Lake Sewer District, 218 Conn. 144, 148-49, 588 A.2d 176 (1991). “The charter of the city of Milford provides for the appointment of a sewer commission of five members and vests in that commission `all the rights, duties and authority of sewer commissions as set out in the general statutes.’ Milford City Charter, art. IV, § 9. That commission also acts as the city’s water pollution control authority pursuant to General Statutes § 7-247[15] . . . .”
Page 426
Schuchmann v. Milford, 44 Conn. App. 351, 355, 689 A.2d 513, cert. denied, 240 Conn. 924, 692 A.2d 818
(1997). Specifically, § 7-247 grants a water pollution control authority (authority), such as the commission in the present case, the ability to “acquire, construct and operate a sewerage system or systems. . . .” In furtherance of those powers, § 7-247 also provides that an authority “may establish and revise rules and regulations for th supervision, management, control, operation and use of a sewerage system. . . .” (Emphasis added.) See als Wright v. Woodridge Lake Sewer District, supra, 149 (“[t]he power to construct, establish and maintain drains and sewers includes power to make reasonable regulations for tapping and connecting with the sewers” [emphasis added; internal quotation marks omitted]). Therefore, although the legislature has granted an authority the ability to “acquire, construct and operate” a sewer system, it only included the power for “operation and use” within the authority’s power to issue rules and regulations.[16] General Statutes § 7-247. Because the legislature did not explicitly subject an authority’s ability to “acquire” or “construct” a sewer system to the issuance of rules and regulations, as it did for the operation and use of the sewer system, we infer that the legislature intended for such authorities
Page 427
to retain the discretionary power needed to fulfill those two objectives.[17] See Wright v. Woodridge Lake Sewer District, supra, 149 (“municipality has wide discretion in connection with the decision to supply sewerage” [internal quotation marks omitted]); Hartford v American Arbitration Assn., 174 Conn. 472, 479, 391 A.2d 137 (1978) (“[w]hen a general power is given to a municipal officer, whatever is necessary for effective exercise of that power is, in the absence of express authority, conferred by implication”); HE. McQuillin, Municipal Corporations (3d Ed. Rev. 2000) § 31.10.10, pp. 199-200 (“A grant of power for sewer construction and maintenance should be liberally construed for the accomplishment of the purposes intended. . . . The municipality within the scope of the power conferred has reasonable discretion to act for the public welfare.”). Simply put, under § 7-247, an authority may exercise its discretionary ability to acquire[18] or construct[19] a municipal sewer system without first having to issue rules and regulations governing such a process. This conclusion is buttressed by a reference to General Statutes §7-247a,[20] which
Page 428
provides that “[n]o . . . authority shall acquire or construct all or part of a sewerage system until after a public hearing at which the affected property owners of the municipality shall have an opportunity to be heard concerning the proposed acquisition or construction. . . .” See R. Fuller, 9 Connecticut Practice Series: Land Use Law and Practice (1999) § 12.4, p. 282 (same). As this statute demonstrates, it is th authority’s decision to acquire or construct a public sewer system that is subject to a public hearing, not the decision of a private developer. Consequently, even if the commission in the present case did want to grant AvalonBay the ability to construct the desired extension, that decision could not be made on the application alone.
The provisions of the Milford code that relate to the sewer system mirror the language and structure of General Statutes §§ 7-245 through 7-2 73a. In accordance with the general grant of powers set forth in § 7-247, § 23-14 of the Milford code provides that “[t]he construction, extension, maintenance and operation of the sewerage system of the city and connections therewith . . . shall be subject to the provisions of this article. . . .” Moreover, in accordance with the grant of power to establish rules and regulations set forth in §7-247, § 23-32[21] of the Milford code, which is entitled “[c]onnection
Page 429
permit required,” provides that “[a] person intending t connect a building drain[22] from his property to the public sewer shall first obtain a permit to connect from the [commission]. . . .” (Emphasis added.) Section 23-32 of the Milford code further provides that “[t]he application shall be signed by . . . the qualified contractor who has been chosen to perform the work of installing and connecting the building drain to the public sewer. . . .” (Emphasis added.) There is no comparable section addressing an application to construct an extension of the public sewer system. Thus, the plain language of § 23-32 of the Milford code reveals that it pertains only to the ability of a property owner to connect a building drain to the municipal sewer system, and does not pertain to the extension of that system. We conclude that AvalonBay’s claim that its application for the construction of an extension of the municipal sewer system complied with § 23-32 of the Milford code is, therefore, without merit. Accordingly, the trial court properly determined that the commission had discretion to table AvalonBay’s third application.[23]
Page 430
III
AvalonBay next claims that, even if we were to assume that the commission had the authority to table AvalonBay’s application on the basis of concerns regarding safety and cost, the trial court’s findings as to the legitimacy of those reasons are clearly erroneous. Because of our conclusion in part II of this opinion, we need not review this claim. More specifically, we have concluded that the commission had discretion to act upon applications seeking to extend the municipal sewer system. See General Statutes § 7-247; Vicksburg v Vicksburg Waterworks Co., supra, 202 U.S. 472. “[W]here a public officer [or board] acts within the scope of delegated authority and honestly exercises her judgment in performing her function, mandamus is not available to review the action or to compel a different course of action.” Clark v Gibbs, supra, 184 Conn. 419; see also 11 E. McQuillin, Municipal Corporations (3d Rev. 2000) § 31.17, pp. 219-20 (discretionary decisions regarding sewer construction not reviewable “unless there appears fraud, oppression or arbitrary action”).
In the present case, AvalonBay sought a writ of mandamus based upon its claim that its third application complied with the regulations governing connections to the public sewer system, and, therefore, that the commission lacked discretion to table its application. In its memorandum of decision, the trial court noted that the commission’s progress with the expansion of the sewer system was “obviously not at a rate acceptable to AvalonBay.” At no point, however, did AvalonBay claim to the trial court that a writ of mandamus was appropriate because the commission was exercising its discretion in an illegal, fraudulent or arbitrary manner. Thus, once the trial court found that the commission had discretion to table the application for construction of an extension of the public sewer system, the court should have denied the writ of mandamus.
Page 431
Accordingly, any findings made by the trial court concerning the reasons behind the commission’s exercise of discretion were unnecessary, and we need not review them.
IV
AvalonBay’s final claim is that the commission’s decision to table its third application thwarts this state’s public policy supporting the development of affordable housing. More specifically, AvalonBay claims that the trial court improperly failed to reconcile the statutes governing water pollution control authorities with statutes encouraging the development of affordable housing.[24] The commission contends that the affordable housing statutes do not apply to a water pollution control authority, and, therefore, the trial court properly denied AvalonBay’s request for a writ of mandamus. We agree with the commission.
Affordable housing is a goal that has long been recognized by the legislature as constituting a substantial public interest. See, e.g., General Statutes § 8-119bb (declaration of policy on housing for low income persons). Consequently, title 8 of our General Statutes, which is entitled “Zoning, Planning, Housing, Economic and Community Development and Human Resources,” is replete with legislative initiatives aimed at, inter alia, increasing “the construction of new housing or rehabilitation of existing housing accommodations to provide
Page 432
safe and sanitary dwelling facilities for low income persons. . . .” General Statutes § 8-119bb (3); see also General Statutes § 8-2g (allowing for special exemption from density limits for construction of affordable housing); General Statutes § 8-30g (providing procedure for affordable housing land use appeals). In none of these statutes, however, has the legislature explicitly extended the affordable housing requirements and considerations to the powers granted to water pollution control authorities under title 7 of the General Statutes. Further, in chapter 126a of title 8 of the General Statutes, the legislature expressly defined a “`[c]ommission'” subject to affordable housing land use appeals to include “a zoning commission, planning commission, planning and zoning commission, zoning board of appeals or municipal agency exercising zoning or planning authority. . . .” General Statutes § 8-30g (a) (4).[25] Consequently, we conclude that the legislature has not required water pollution control authorities to treat applications related to developments with affordable housing components differently from applications for
Page 433
other types of developments, as it has with other municipal bodies.[26]
The judgment is affirmed.
In this opinion the other justices concurred.
A “[b]uilding sewer” is defined in § 23-12 of the Milford code as “[t]he extension from the building drain to the public sewer or other place of disposal. . . .”
(Emphasis added.) There is no option for requesting to construct an extension of the sewer system. Moreover, the specific application form for commercial, industrial and multifamily developments, which AvalonBay filed for its proposed development, is entitled an “application for sewe connection,” and it makes no reference to the construction of an extension to the sewer system. (Emphasis added.)